|
...continuing from front page...
This year's meeting scheduled for June 4 to 7, 2001 will be held in San Juan,
Puerto Rico and will be hosted by Puerto Rico Electric Power Authority (PREPA).
Mr. Angel J. Delgado Torres (aj_delgado@yahoo.com) from
PREPA
is this year’s meeting secretary. He is planning a
trip to PREPA’s newest GIS (Gas Insulated Substation), which features a technology
seldom seen in North America. To attend the meeting, please register online
at www.sestech.com/ses_users/users.asp.
These annual meetings provide CDEGS users the opportunity to provide input for the
enhancement of the software and to review recent changes. They are also a great forum
for users to make presentations on electrical safety, transmission line and
substation grounding design, improved methods for protecting equipment and pipelines
against ac interference, lightning and surge studies, and electromagnetic fields
analysis.
|
Users’ Group Chronology: (Year, Location and Host Company) |
| 1991 |
Montreal, Quebec, Canada (SES) |
| 1992 |
Calgary, Alberta, Canada (TransAlta Utilities) |
| 1993 |
Juno Beach, Florida, USA (Florida Power & Light) |
| 1994 |
San Ramon, California, USA (Pacific Gas & Electric) |
| 1995 |
Gaithersburg, Maryland, USA (Bechtel) |
| 1996 |
Austin, Texas, USA (Lower Colorado River Authority) |
| 1997 |
Chicago, Illinois, USA (Commonwealth Edison) |
| 1998 |
Columbia, North Carolina, USA (South Carolina Electric & Gas) |
| 1999 |
Portland, Oregon, USA (T&D Engineering) |
| 2000 |
Montreal, Quebec, Canada (SES) |
| 2001 |
San Juan, Puerto Rico (Puerto Rico Electric Power Authority) |
Bruno Simon, Products and Services Manager, SES
|